Generator & Power Control Systems
Reliable generator control is essential for managing performance, safety, and continuity across modern power backup systems. From a single control panel to fully integrated electrical systems, control infrastructure ensures power is delivered efficiently and responds correctly under all conditions.
01
02
Control System Installation (AMF / ATS)
Control system installation focuses on setting up the core electrical systems that manage how a generator responds to power loss. This includes configuring control panels, transfer switching, and system logic to ensure seamless operation between mains and backup power sources across both standard and diesel generators.
03
Integrating electrical controls with a Building Management System enables centralised monitoring and control. This connection links the generator control panel with wider building infrastructure, improving visibility, coordination, and overall system efficiency.
BMS (Building Management System) Integration
Load Testing & System Validation
Generator Automation Setup
Modern generator automation systems are designed to improve response times and reduce manual intervention. Through advanced control technology, generators can automatically detect outages, start up, and stabilise power delivery, forming a critical part of any reliable power system.
04
Load testing ensures that the full generator control system performs as expected under real operating conditions. By validating each electrical component, including automation and control panel functions, reliability can be confirmed before the system is relied on for critical backup power.
Need a reliable control system for your generator setup?
Speak with our team about tailored electrical control systems and automation solutions.
Team
LEADERSHIP GROUP
Tom Cox
Operations Director
tom@gencontrols.co.nz
An accomplished Industrial Electrician and Controls specialist, with over 15 years experience in the energy sector. Tom leads the operations team with a strong focus on problem solving, technical efficiency and excellence.
Tom is responsible for overseeing the entire project delivery process. As a seasoned professional delivering complex installations and upgrades across Data Centres, Telecommunications and Infrastructure, he ensures alignment to specifications and regulatory requirements.
Ben Hamilton
Managing Director
ben@gencontrols.co.nz
Ben plays a pivotal role in driving the delivery of both off-site and on-site operations at PGC. With a background delivering major construction projects in New Zealand and the South Pacific, Ben leads a team of skilled engineers. Guiding them through the creation of detailed project plans and ensuring the technical integrity of all installations.
With a strong commitment to innovation, Ben fosters a culture of excellence, constantly pushing for new, efficient solutions while maintaining the highest engineering standards.
William Hamilton
Chairman & Company Director
Experienced Director and Executive Manager with a demonstrated history of working in multiple businesses, including construction, infrastructure, telecommunications, electrical distribution, manufacturing, property development and real estate.
William is highly skilled in developing strategic initiatives with proven experience in the implementation of strategy and developing sustainable strategic partnerships.